Environmental Permit No. EP-039/2000/E

環境許可證編號  EP-039/2000/E

 

 

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

(CHAPTER 499)

Section 10&13

 

環境影響評估條例

(499)

10 13

 

ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE A DESIGNATED PROJECT

 

建造及營辦指定工程項目的環境許可證

 

PART A (MAIN PERMIT)

A (許可證主要部分)

 

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (the Ordinance), the Director of Environmental Protection (the Director) granted the Environmental Permit (EP-039/2000) to Kowloon Canton Railway Corporation (hereinafter referred to as the "Permit Holder") on 15 January 2000. Pursuant to Section 13 of the Ordinance, the Director amends the Environmental Permit (EP-039/2000/D) based on the Application No. VEP-157/2004. The amendments, described below, are incorporated into this Environmental Permit (EP-039/2000/E). This Environmental Permit as amended is for the construction and operation of the designated project(s) described in Part B of this Permit subject to the conditions described in or attached to Part C of this Permit.

 

根 據 環 境 影 響 評 估 (條 例 ) 10條 的 規 定 ﹐ 環 境 保 護 署 署 長 (署 長 ) 2000 115日 將 環 境 許 可 證 (EP-039/2000) 批予九廣鐵路公司 (下 稱 "許 可 證 持 有 人 ")。 根 據 條 例 第 13條 的 規 定 , 署 長 因 應 更 改 環 境 許 可 證 的 申 請 編 號 VEP-157/2004修 訂 環 境 許 可 證 編 號 EP-039/2000/D。 以 下 修 訂 已 包 含 在 本 環 境 許 可 證 內 (EP-039/2000/E)。 本 經 修 訂 的 環 境 許 可 證 作 為 建 造 及 營 辦 本 許 可 證 B 所 說 明 的 指 定 工 程 項 目 , 但 須 遵 守 本 許 可 證 C 所 說 明 或 附 載 的 條 件 。

 

The issue of this amended environmental permit is based on the documents, approvals or permissions described below:

 

本經修訂的環境許可證乃依據下列文件、批准或許可條件而簽發

 

 

Application No.

申請書編號:

 

 

VEP-157/2004

VEP-157/2004


 

 

Document in the Register:

登記冊上的文件:

 

 

Tai Wai to Ma On Shan Extension – Environmental Impact Assessment Study (Register No. AEIAR-028/1999) (3 volumes dated October 1999)

[hereinafter referred to as the “EIA Report”]

 

The Director’s letter approval of the EIA Report dated 15 January 2000 ref () EP2/N1/A/38

 

東鐵延伸段:大圍至馬鞍山段環境評估 (登記冊編號:AEIAR-028/1999)(3199910)

[下稱環評報告”]

署長已於二零零零年一日十五日發出批准該環評報告的信。

 

Environmental Permit issued – Permit No.: EP-039/2000 issued on 15 January 2000.

 

已簽發的環境許可證 — 許可證編號:EP-039/20002000115日簽發。

 

Application for Variation of an Environmental Permit No. VEP-012/2000.  [Hereafter referred to as “the Application VEP-012/2000”]

 

申請更改環境許可證編號VEP-012/2000

[下稱申請書編號VEP-012/2000”]

 

Environmental Permit issued – Permit No.: VEP-012/2000/A/EP-039 issued on 20 April 2000.

 

已簽發的環境許可證 — 許可證編號:VEP-012/2000/A/EP-0392000420日簽發。

 

Application for Variation of an Environmental Permit No. VEP-031/2000.  [Hereafter referred to as “the Application VEP-031/2000”]

 

申請更改環境許可證編號VEP-031/2000

[下稱申請書編號VEP-031/2000”]

 

Environmental Permit issued – Permit No.: VEP-031/2000/B/EP-039 issued on 1 November 2000.

 

已簽發的環境許可證 — 許可證編號:VEP-031/2000/B/EP-0392000111日簽發。

 

Application for Variation of an Environmental Permit No. VEP-057/2001.  [Hereafter referred to as “the Application VEP-057/2001”]

 

申請更改環境許可證編號VEP-057/2001

[下稱申請書編號VEP-057/2001”]

 

 

 

Document in the Register:

登記冊上的文件:

 

 

Environmental Permit issued – Permit No.: EP-039/2000/C issued on 21 December 2001.

 

已簽發的環境許可證 — 許可證編號:EP-039/2000/C20011221日簽發。

 

Application for Variation of an Environmental Permit No. VEP-085/2003.  [Hereafter referred to as “the Application VEP-085/2003”]

 

申請更改環境許可證編號VEP-085/2003

[下稱申請書編號VEP-085/2003”]

 

Environmental Permit issued – Permit No. EP-039/2000/D issued on 13 March 2003.

 

已簽發的環境許可證 — 許可證編號:EP-039/2000/D2003313日簽發。

 

Application for Variation of an Environmental Permit No. VEP-157/2004.  [Hereafter referred to as “the Application VEP-157/2004”]

 

申請更改環境許可證編號VEP-157/2004

[下稱申請書編號VEP-157/2004”]

 

 

 

 

Application No.

申請書編號

Date of Application

申請日期

List of Amendments Incorporated into this Environmental Permit

已包含在本環境許可證內修訂項目

Date of Amendment

修訂日期

VEP – 012/2000

28 March 2000

 

2000328

Vary Conditions 1.7 and 2.1 and